Case studies

Energy management results across real facilities.

See how organizations have used monitoring, analytics and controls to identify operational waste, improve equipment performance and reduce energy costs.

01

Convenience retail

7-Eleven Denmark

A four-site proof of concept used monitoring and low/no-cost actions before a broader multi-site rollout.

12.9% energy and cost savings in PoC19-month payback120-store rollout

The proof of concept saved 26,500 kWh across four sites, followed by 2.7 million kWh across the expanded rollout.

Read case study
02

Grocery refrigeration

Safeway Canada

A before-and-after comparison evaluated refrigeration compressor consumption over matched two-week periods.

12% reduction in test period5,063 kWh reduction3-month payback

Matched two-week periods showed consumption falling from 43,174 kWh to 38,111 kWh after installation.

Read case study
03

Food service

Starbucks India

Monitoring exposed air-conditioning operation outside the store's required hours, leading to a targeted control response.

11% AC energy reduction4.5-hour runtime reduction4-month ROI

Air-conditioning runtime fell from more than 23 hours per day to 18.5 hours while maintaining comfort.

Read case study
04

Multi-site food service

Secret Recipe Malaysia

A proof-of-value focused on refrigeration, air conditioning and lighting before a 100-store program.

>15% savings in proof of value100-store project>1 million kWh/year forecast

The proof of value identified more than 15% savings, supporting a 100-store expansion forecast to save over 1 million kWh annually.

Read case study

Measurement and verification

Define the comparison before making the change.

  1. 1

    Establish the baseline period and data quality.

  2. 2

    Record the operational change and implementation date.

  3. 3

    Account for relevant drivers such as weather, production or occupancy.

  4. 4

    Track persistence and investigate drift after the initial result.

Build your facility baseline

Start with a baseline and a question your facility team needs answered.

A focused assessment establishes fit, identifies the most useful data and defines a practical next step without committing to a full rollout.